add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Patrol (from 1988 to 1997, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Patrol
Home
 
Nissan
Patrol
Introduction
Troubleshooting
Adjustment and routine maintenance
Engine
Engine 4.2 l
Removing and installing engine
Removal, dismantling, checking the condition and installation of rocker arm assembly and rod pushers
Removal and installation of the inlet pipeline
Removing and installing exhaust manifold
Maintenance of the cylinder head
Removal, check the condition and maintenance of the timing components (chain and sprockets)
Removal, check of a condition and installation of a camshaft and pushers
Removing and installing oil pan and oil pump maslozabornika
Service oil pump
Replacement seals crankshaft
Service connecting rod and piston assembly and the cylinder bores
Service crankshaft and main bearings
Service flywheel / drive disc
Removal and installation of support of the power unit
Engine 3.0 l
System of cooling, heating and air conditioning
The power supply system and exhaust
Systems for reducing emissions
Systems of an electric motor
Transmission
Clutch
Brakes
The front and rear axles, chassis and steering
Body
Onboard electric
 


Hit Counter by Digits


print page printable version

Removal, dismantling, checking the condition and installation of rocker arm assembly and rod pushers



The design of the cylinder head does not allow withdrawal of pushers until until she will be removed and its head gasket. In view of the above procedure for removing pushers dealt with separately in the section on maintenance of a camshaft and pushers.

Removal and dismantling

PERFORMANCE ORDER

  1. Disconnect the negative wire from the battery.
  2. Remove the air cleaner assembly.

To avoid falling into the carburetor debris and foreign objects, cover his neck cloth.

  1. Mark and disconnect all hoses and cables preventing the removal of the cylinder head cover.
  2. Gradually, over a quarter of a turn for each approach, loosen the cover bolts, - start with the outer bolts and move inside. Remove the cylinder head cover, taking care that dirt and debris do not fall into the engine.
  3. Use a screwdriver or a wrench, loosen the screw adjustment of backlashes of valves to the full load is removed with the valves.
  4. Gradually, moving from outside to inside, loosen the bolts of the rocker pedestals.
  5. Rotate the pushrods, liberate them from the rocker arm assembly and carefully remove the latter.
  6. Remove the pushrods, putting them in accordance with the placement of the engine - the right thing to make for orderly storage rod pushers special pattern rail of thick cardboard.
  7. Remove the components from the rocker, folding in the order in which they were placed in the assembly.

Cleaning and checking the status of

PERFORMANCE ORDER

  1. Clean all removed components in a suitable solvent, and then dry thoroughly, blowing with compressed air.
  2. Check the patency of all maslotokov assembly components, blow holes and channels with compressed air.
  3. Check all components for signs of wear and mechanical damage. Replace defective parts.
  4. Check the condition of working surfaces of the rocker arm in contact with the valve stems. If signs of excessive wear, replace the defective rocker. Light mechanical damage in the form of scratches can be removed using the grindstone for dressing and butter.
  5. Using a suitable micrometer measure diameters of axial holes rocker and the rocker arm shaft diameters in the areas of accommodation of the latter. By subtracting the first results of the second landing clearances define the rocker. In case of exceeding the permissible clearances values (see. Table sizes and adjustments in the end of this manual), replace worn components.

Assembly and installation

Assembly and installation in the reverse order.

PERFORMANCE ORDER

  1. Before assembly, lubricate abundantly countertops rocker axis and motor oil.
  2. Slide the components of the assembly on the rocker arm shaft in the same manner (the valve components shown in the accompanying illustration).
1 - assembly of the rocker arm shaft
2 - bolts
3 - washers
4 - Rocker
5 - pedestals
6 - a spring
  1. Grease the ends of bars of pushers motor oil and insert rods to their nests in the cylinder head.
  1. Install the rocker arm assembly in the cylinder head (see. Accompanying illustration) and by hand tighten the mounting bolts. Make sure that the spherical tip of the rocker arm screws properly hit the jack saddle their pushers.
  1. In several stages, tighten the bolts with demanded effort pedestals.
  2. On the cold engine make installing valve clearance. Temporarily install the cylinder head cover and the air cleaner and running the engine, warm it up to normal operating temperature. Check the valve clearances on the engine is warm, if necessary, make adjustments.
  3. Remove the cylinder head cover and re-install it with a new seal, the neck of the Gulf oil motor forward. Screw fixing bolts and tighten them in two stages, spiraling from the inner outward.
  4. Plug into place all removed in the process of removing the hoses and cables.
  5. Replace the air cleaner assembly.
  6. Start the engine and check for signs of oil leakage.




« previos page
Removing and installing engine
next page »
Removal and installation of the inlet pipeline

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.