printable version
Removal and installation of the inlet pipeline
Withdrawal The layout of components on an accompanying illustration facilitate the implementation of the procedures described below. Air cleaner removed in the illustration. | |
| - Disconnect the negative wire from the battery.
- Remove the air cleaner and disconnect hoses of giving and fuel return from the fuel vapor separator.
- Drain the cooling system.
- Loosen the hose clamps and remove the upper radiator hose and heater hose from the intake manifold.
- Loosen the nuts to the bracket the throttle cable. Turn the actuating lever, completely open the valve and remove the tip of a cable from the holder. Pull the cable to the side to remove it from the workspace.
- Disconnect the electrical wiring from the carburetor.
- Disconnect the hose of the vacuum brake booster from intake manifold.
- Give bracket bolts of the ignition coil to the inlet pipeline.
- Using tongs, disconnect the tube valve systems of exhaust gas recirculation (EGR) and ART from the valve EGR.
- On models equipped with air conditioning, vacuum hoses, disconnect the solenoid valve of stabilization of turns of idling of the damper throttle and inlet pipeline.
- Gradually, spiraling from the ends of the inlet pipe to the center, give fixing bolts and nuts.
- Trying to prevent dirt from entering the engine, carefully remove the inlet pipeline. Discard the old gasket.
|
|
Setting Installation is in the reverse order. | - Carefully smooth mating surfaces and check flatness. If necessary, make the pipeline bore.
- It is mandatory to replace the gasket.
- In several stages, spiraling from the center of the pipe to the outside, tighten fixture with demanded effort.
- Restore all source connecting wiring, vacuum, fuel and cooling lines.
- Fill the cooling system.
- Start the engine and check the vacuum loss and leakage of fuel, oil and water.
|
|
|