printable version
security measures
ATTENTION When all installation work, in particular in the engine compartment, because of the tight layout, consider the following. Motorways of all kinds (such as fuel, hydraulic absorber, activated carbon, cooling systems, circuit conditioning systems, brake lines, vacuum hoses) and electrical wiring must be routed as they were originally laid. Provide space for all moving or hot components. |
When using the instrumentation during the test drive, observe the following rules. Control and measuring devices must be firmly secured in the back seat. There you should be working with them a second specialist. When working with instrumentation specialist will be on the front passenger seat, the airbag is triggered it can get injured. To avoid personal injury and / or damage to the injection system and bulbs should observe the following requirements Disconnecting and connecting electrical cables and lamps injection system, as well as measuring devices is only allowed with the ignition off. If the engine must be activated for start-up speed, without a subsequent run, such as compression measurements, disconnect the connector unit injectors on the cylinder head. Disconnecting and connecting the battery terminals should be done only when the ignition is switched off, because otherwise you may damage the control unit of the system of direct injection diesel.
|