add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Jeep Grand Cherokee (from 1993 to 1999, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Jeep Grand Cherokee
Home
 
Jeep
Grand Cherokee
Introduction
Adjustment and routine maintenance
The straight six-cylinder engine
The V8 engine
Procedure of the general and engine major repairs
Systems of cooling, heating and air conditioning
The power supply system and exhaust
general information
Fuel Pressure Relief Procedure
Checking fuel pressure and the functioning of the fuel pump
Removing and installing fuel tank
Cleaning and repair of the fuel tank - general information
Repair and replacement of fuel lines
Removal and installation of the fuel pump
Check of serviceability and replacement of the fuel level sensor unit
Removal and installation of assemblage of an air cleaner
Replacement of a cable of gas
Fuel Injection System - general information
Check of the fuel injection system
Check of serviceability, removing and installing throttle body
Check of serviceability and replacement of the fuel pressure regulator
Check of serviceability, removal and installation of fuel injectors
Check of functioning and replacement of components of system of stabilization of turns of idling (IAC)
Service exhaust system - general information
The system of electric motor
Systems of decrease in toxicity of the fulfilled gases and engine management
Manual box of a gear change
Automatic Transmission
Transfer Case
Clutch and transmission line
Brakes
Suspension and steering
Body
The system of on-board electrical equipment
Controls and operation receptions
 


Hit Counter by Digits


print page printable version

Removal and installation of assemblage of an air cleaner



PERFORMANCE ORDER

  1. Disconnect the negative wire from the battery.
  2. Remove the air cleaner cover and air filter element (Chapter Settings and maintenance).
  3. Release the clamps that secure the air intake hose to the air cleaner housing.

Assemble the air cleaner engines in volume of 4.0 l.

The components of the air engine capacity of 5.2 liters.
  1. Give the mounting bolts of the air cleaner in the engine compartment.
  1. Give bolts (arrows) fastening of a casing of an air cleaner in the engine compartment.
  1. Lift the assembly up and remove it from the fresh air intake hose, then remove the assembly from the engine compartment.
  2. Install in reverse order.




« previos page
Check of serviceability and replacement of the fuel level sensor unit
next page »
Replacement of a cable of gas

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.