add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Volkswagen Passat B6 (from the year 2004)

general info. full specifications. diagnostics. hints. tips. tricks
Volkswagen Passat B6
Home
 
Volkswagen
Passat B6
Operation and maintenance of car
Engine
Transmission
Overview
Manual Transmission
Automatic transmission
Transmission
Transmission
Marking gearbox
Capacities
Check the ATF level and top-up
Draining ATF and filling
Electrical / electronic components and their installation location
Removal of the lever gearbox control selector
Removal and installation of a cable of the selector gearbox
Check selector lever cable
Adjust selector lever cable
Removing and installing handle
Check gearshift
Removing manual, Passat 2006 with "external" water cooling radiator ATF
Installation manual, Passat 2006 with "external" radiator cooling ATF
Drive Train
Tables
Chassis
Steering Gear
Brakes
Onboard electric
Body
diagrams
 


Hit Counter by Digits


print page printable version

Installation manual, Passat 2006 with "external" radiator cooling ATF



Installation is basically the reverse order, but must comply with the following instructions.
Check, if pressed on the flange of the motor centering sleeve.
Check the fit of the metal pads (engine-KP). The gasket must adhere to the engine over the entire circumference, if lightly pressed with both hands to the motor. If it appears at the top of the engine, this means that for the engine gasket leash hung incorrectly.
Engine and gearbox must be installed on the support of the power unit without straining. For information on how this should be stated in correctly perform.
Torque.
Replace all screws on the left support bracket assembly.
First, the new screw bolts by hand.
When installing the screw console to gearbox with a torque of 40 Nm + 90 ?�.
For tightening both bolts console to the car between the two screws with a screwdriver can ototregulirovat "old land" bolts. These two large bolts are tightened with a torque of 60 Nm + 90 ?�.
Replace the O-ring on the pipeline fluid ATF.
Screw the ATF pipes to the gearbox.
Attach two of the wires.
After installation, check the fluid level ATF.

Pipelines zhikosti ATF, ?�external" radiator cooling the ATF and an additional cooling radiator the ATF

Piping the ATF on the gearbox
Fig. 3.92. Piping the ATF on the gearbox: 1 - ATF fluid conduit; 2 - ATF fluid conduit; 3 - a nut


External heat sink the ATF
Fig. 3.93. External cooling radiator fluid ATF: 1 - a bolt; 2 - a nut; 3 - an external radiator cooling fluid ATF; 4 - a bolt; 5 - ATF fluid conduit; 6 - ATF fluid conduit; 7 - a nut


Additional radiator cooling the ATF
Fig. 3.94. Additional radiator cooling fluid ATF: 1 - additional cooling radiator fluid ATF; 2 - a bolt; 3 - a bolt; 4 - ATF fluid conduit; 5 - ATF fluid conduit; 6 - a bolt; 7 - a bolt







« previos page
Removing manual, Passat 2006 with "external" water cooling radiator ATF
next page »
Drive Train

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.