Remove the bracket bolts and remove the block HECU with bracket.
Do not disassemble the hydraulic block HECU.
HECU transportation unit should be carried out in a vertical position with the holes block closed with suitable plugs, as brake fluid should not be merged with the unit.
Disconnect the connector from the power HECU.
Setting
PERFORMANCE ORDER
Installation is performed in reverse order of removal.
Tighten bolts and nuts of the modulator brake pipe required torques.
Tightening torques:
Bolt block HECU: 8-10 N ??? m Connecting the brake pipe nuts: 13-17 N ??? m