printable version
Replacing right axle gearbox oil seal
To change, proceed as follows: a) preliminary tasks: - Loosen the nuts of the front right wheel; - Raise the front of the vehicle; - Put the support legs underneath for mounting the jack; - Remove the right wheel; b) Disconnect the steering knuckle by a shock absorber: - Remove the wire from the ABS bracket;
| Fig. 5.44. Mounting the shock absorber to the steering knuckle 1 and 2 - bolts; 3 - Bracket
|
- Remove the bracket 3 (Fig. 5.44) from the brake pipe; - Remove the brake line from the bracket; - Turn out the top bolt 1; - Turn out the bottom bolt 2;
| Fig. 5.23. Removing the front mudguard of the engine
|
| Fig. 5.26. Heat shield bolts (arrows)
|
| Fig. 5.27. The mountings of the engine mounts and the central longitudinal beam (shown by arrows)
|
| Fig. 5.31. Disconnecting the right axle: 1 - mandrel
|
- Remove the two locking pin with a mandrel diameter of 5 mm; - Press the knuckle and remove the axle shaft of the gearbox; g) Remove the stuffing box: - Remove the O-ring; - Remove the oil seal; - Clean the stuffing box and the shaft. h) install a new gland the right axle on vehicles with manual gearbox M3R: - Lubricate the contact edge of a new oil seal;
| Fig. 5.45. Install gland right axle shaft for vehicles with manual transmission M3R
|
- Install the oil seal on the guide sleeve; - Remove the tool; - Install new O-ring on the shaft; On vehicles with manual transmission M5P / M5D: - Lubricate the contact edge of a new oil seal;
| Fig. 5.46. Install gland right axle shaft for vehicles with manual transmission M5P / V5D
|
- Install the oil seal on the guide bushing 999 5316 (Fig. 5.46); - Install the oil seal in the gearbox; - Install new O-ring on the shaft; and) set the axis:
| Fig. 5.47. The combination of the holes (indicated by arrows) for the locking pins when installing the half-line
|
- Establish the right axle on the slots so that the holes for the locking pins in line (Fig. 5.47). If the hole Transmission is bottom (bottom of the space between the teeth) between two slots, the corresponding hole in the half-axis should be at the top of the slot axis and vice versa; - Put the upper bolt knuckle;
| Fig. 5.48. Installing the locking pins in the half-line
|
Install two new locking pin (Fig. 5.48). Fill the hole with sealant 1161058-1 locking pins; a) establish a central longitudinal beam and heat shield (see. Div. "Installation of transmission" and Fig. 5.27); - Put the two new adjusting screw and tighten to 90 N ?� m; - Set the brake lines to the bracket and fix the bracket; - Secure the ABS system in a bracket; - Set the wheel; m) Check the oil level in the gearbox and top up with oil (see. Div. "Installing the gear box"); n) Install the front mudguard of the engine (Fig. 5.23) and secure it with bolts and screws. Tightening torque 10 Nm.
|