The piston pin
Withdrawal
Setting
Check
The piston and the piston pin
PERFORMANCE ORDER | 1. Check the outer surface of the piston for damage, develop or uneven wear. If necessary, replace the piston. | 2. Check each piston ring for damage and uneven wear. If necessary, replace the piston rings. | A warning When replacing the piston as the piston rings must be replaced.
| 3. Check the piston pin by inserting it into the hole of the piston. The piston pin must be a smooth entrance into the piston by pressing it by hand (at room temperature). |
|
Piston rings PERFORMANCE ORDER | 1. Insert the new piston ring in the groove of the piston and probe measure the clearance between the piston ring and the wall of the groove. If the clearance exceeds the limit, replace the piston. The gap between the piston ring and the groove in the piston: The first compression ring: 0,04-0,085 mm The second compression ring: 0,04-0,085 mm Maximum permissible backlash: 0,1 mm | 2. Measure the end gap of the piston rings, piston ring is manually inserted into the engine cylinder. Piston crown push the piston ring into the bottom of the cylinder. Feeler gauge, measure the end gap of the piston ring. The gap piston ring: The first compression ring: 0.15-0.30 mm The second compression ring: 0.20-0.40 mm Scraper ring: 0,20-0,70 mm Maximum permissible backlash: 1,0 mm |
|
Setting PERFORMANCE ORDER | | 1. Install the spacer. | 2. Install the upper side rail. To install the side rail, first place one end of the side guide wall between the piston ring groove and the spacer, click on it and then clicking on the perimeter, install it in the groove of the piston. | A warning Do not use pliers for a release of piston rings when installing side rail.
| | 3. Likewise, set the low side guide. | 4. pliers for a release of piston rings, set the compression ring ?��2. | | 5. pliers for a release of piston rings, set the compression ring ?��1. | 6. Apply a thin coat of engine oil to the piston and piston rings. | | 7. Place the piston rings, as shown in the figure. | 8. The special adaptation compress piston rings on the piston. | 9. Install the piston with the piston rings over the first cylinder, and the mark on the piston must be pointing toward the front of the cylinder. | 10. hammer handle press the piston into the cylinder so that the bottom head of a rod was established on the crankshaft. | 11. Install connecting rod bearings into the connecting rod cap. | | 12. Replace the cover and tighten the connecting rod nuts. Torque: 32-35 N ??? m | | 13. A probe inserted between the connecting rod and the crankshaft, connecting rod, measure the backlash. Nominal backlash rod: 0.10-0.25 mm Maximum permissible backlash: 0,40 mm |
|
|