printable version
Engine installation
Installation is carried out in reverse order.
ATTENTION When all installation work, in particular in the engine compartment, because of the tight layout, consider the following. Lines of all types (e.g. fuel, hydraulic absorber, activated carbon, cooling systems, coolant, brake lines, vacuum tubes), and also necessary to lay electric wires as they were originally laid. Provide sufficient space to all moving or hot components to avoid damage to any kind of lines. |
Vehicles with manual transmission Check clutch release bearing for wear and replace if necessary. Lightly grease clutch release bearing, guide bushing and the teeth of the input shaft with grease. Check the engine block-fitting sleeves for centering the engine / gearbox, if necessary, install them.
Suspend the intermediate plate on the flange and put it on the sleeve-fitting (Fig. 2.11). When the unit is installed must have sufficient space to pivot shafts. Align the engine mount, shaking him. Install drive shafts. Install the air conditioning compressor. Install poly V-belt. Install hydraulic clutch slave cylinder. Connect the drive gear. Install the battery and battery holder frame. Connect the battery. Install the front left and right wheel arch liner. Install the crankcase. Fill in cooling liquid. Install the air filter. Remove the value in memory and adapt engine control unit to the control module and the throttle valve EGR.
Tightening torques
|