add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Mercedes-Benz G-Class (W463, 1999 issue)

general info. full specifications. diagnostics. hints. tips. tricks
Mercedes-Benz G-class
Home
 
Mercedes-Benz
G-class
Introduction
Controls and operation receptions
Current care and maintenance
Engine
System of cooling, heating, ventilation and air conditioning
The power supply system and exhaust
General information and safety measures
The power supply system of petrol engines
The power supply system of diesel engines
Overview
Checks fuel injection system
Service components of an inlet air path
Service components of the throttle
Emptying the fuel tank
Removal and installation of the gauge of a stock of fuel
Removal of air from a contour of low pressure fuel path
Removal and installation of the fuel pump prior
Removal and installation of the fuel pump (high pressure pump)
Removal and installation of a fuel distributive highway and injectors
Removal and installation of the pressure sensor in the fuel line
Removal and installation of the valve, the fuel pressure regulator
Removal and installation of the valve assembly
Removing and installing fuel cooler
Removal and installation of low-temperature cooler
Removing and installing fuel injection control module
Removing and installing fuel tank
Exhaust systems and reduce emissions
Systems of an electric motor
Automatic Transmission
Transmission Line
Brakes and auxiliary systems
Suspension and steering
Body
Onboard electric
Wiring
 


Hit Counter by Digits


print page printable version

Removal and installation of the fuel pump (high pressure pump)



Models 463.323 (M612)

Details of installation of the pump (M612)

1 - Pressure line
2 - pump
3 - Mounting boss
4, 5 - Brackets
6 - the fuel return line

7 - Yokes
8 - Bolts
9 - drive element
10 - Seal

PERFORMANCE ORDER

  1. Remove the trim panel of the cylinder head cover.
  2. Remove the accessory drive belt (see chap. Engine).
  3. Otboltite from the pump (2) the pressure line (1), - loosen the screw connection (3), which must be held by turning the second key. Disconnect the rigging lugs of the power unit bracket (4).
  4. Remove the pump assembly (2), bracket (5).
  5. Release fixing collars (7) and move toward the fuel return line (6).
  6. Disconnect the return line (6) from the pump (2), - ready to collect spilled fuel.

O-ring must be replaced without fail.

  1. Remove the bolts (8) and remove the pump assembly (2).

Pump can not be disassembled! If necessary, it can be removed the drive element (9) (Prepare replaceable sealing ring (10).

  1. Installation is in the reverse order. Do not forget to replace the sealing elements, make sure the observance of purity mating surfaces and seating the drive element (9).

Worn drive element (9) is replaced complete with the intermediate sprocket drive pump.

  1. Finally, clean the processor memory on-board self-diagnostic system (see chap. Systems of an electric motor).

Models 463.333 (M628)

Details of installation of pump motor M628 (1 of 2)

1 - pump
2 - Fuel Line
3 - Pressure line pump
3a - Mounting boss
4 - the fuel return line
5 - Bolt
6 - Floating coupling injection timing angle

7 - Seal
8 - Bolt
9 - Preliminary fuel pump
10 - drive element
11 - Seal
12 - Bolt
Y94 - Quality Control Valve mixture

Details of installation of pump motor M628 (2 of 2)

1 - pump
6 - Floating coupling injection timing angle

13 - Interim sprocket drive centrifugal pump with corrector
14 - Jack

PERFORMANCE ORDER

  1. Remove the air cleaner and the throttle actuator to the upper airways (see. Section Service Component inlet air path).
  2. Otboltite from the pump (1) the pressure line (3) and the fuel return line (4), - Prepare removable sealing elements (cone and ring).

Threaded fitting (3a) to be retained against rotation by a second key.

  1. Disconnect the communication line (arrow) from the valve controls the amount of the mixture (Y94).
  2. Remove the bolts (5) and remove the fuel pump assembly (1).

Do not open the pump assembly, - if necessary, remove the floating sleeve (6)!

  1. Rate the degree of wear of the clutch (6), in case of need make its replacement (assembly with the idler gear pump and a centrifugal corrector (13)).
  2. Installation is in the reverse order - make sure that when installing the pump housing (14) intermediate stars were deployed in the same direction as the zero mark (arrow). Be sure to replace the sealing element tensioner. Do not forget to replace all sealing elements, make sure the observance of cleanliness of interfaced surfaces.
  3. Finally, clean the processor memory on-board self-diagnostic system (see chap. Systems of an electric motor).




« previos page
Removal and installation of the fuel pump prior