add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Jeep Grand Cherokee (from 1993 to 1999, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Jeep Grand Cherokee
Home
 
Jeep
Grand Cherokee
Introduction
Adjustment and routine maintenance
The straight six-cylinder engine
general information
Repair procedures, the implementation of which is possible without removing the engine from the car
Bringing to TDC of the compression stroke of the piston of the first cylinder
Removing and installing cylinder head cover
Removal, check of a condition and installation of the rockers and bars of pushers
Replacement valve springs, their plates and valve stem seals
Removing and installing intake manifold / exhaust manifold
Removal and installation of the cylinder head
Replacement of a forward epiploon of a cranked shaft
Condition check, removal and installation of a cover of the distribution chains, and its stars
Removal, check of a condition and installation of a camshaft, bearings and hydraulic tappets
Removing and installing sump
Removal, check of a condition and installation of the oil pump
Removal and installation of a flywheel / drive disc
Replacing the rear crankshaft oil seal
Check and replacement of rubber pillows of support of the engine
The V8 engine
Procedure of the general and engine major repairs
Systems of cooling, heating and air conditioning
The power supply system and exhaust
The system of electric motor
Systems of decrease in toxicity of the fulfilled gases and engine management
Manual box of a gear change
Automatic Transmission
Transfer Case
Clutch and transmission line
Brakes
Suspension and steering
Body
The system of on-board electrical equipment
Controls and operation receptions
 


Hit Counter by Digits


print page printable version

Removing and installing intake manifold / exhaust manifold



Before proceeding with the procedure, let the engine cool completely.


As the intake manifold and exhaust manifold gasket are common, their removal is usually done at the same time. All studs and bolts must be wetted before the giving of penetrating oil.

Withdrawal

PERFORMANCE ORDER

  1. Disconnect the negative wire from the battery.
  2. Dampen a penetrating oil thread mounting studs and exhaust manifold bolts to the collector a reception pipe of the exhaust system.
  3. Remove the air cleaner assembly (Head of the Power supply system and exhaust).
  4. Disconnect the throttle cable, the throttle mode kickdown (AT models only) and Tempostat (if available) from the throttle body.
  1. Disconnect the throttle body throttle cable, the throttle mode kickdown and Tempostat (if provided).
  1. Mark and disconnect from the exhaust manifold all vacuum lines and electrical connectors.
  2. Relieve pressure and disconnect the fuel supply line and fuel return from the fuel line assembly (Chapter power supply system and exhaust). Plug the open ends of lines.
  3. Loosen the belt drive belt (Head of Adjustment and routine maintenance).
  4. Remove the intake manifold system hydrostrengthening steering pump with bracket and set aside, without disconnecting from it hoses. Make sure that the pump has been installed under the bottom to avoid leakage of hydraulic fluid from it.
  5. Remove the fuel rail with injectors (Head of the Power supply system and exhaust).
  6. Give nuts / bolts of the inlet pipeline.

Access to four of the fastener elements of the intake pipe (arrows) is possible from the top - to the give the remaining four elements need to reach for the pipeline.

  1. Gently pull the pipe from the engine, removing the guide pins on the cylinder head, then remove it from the engine compartment.
  2. Give two bolts and nuts to the exhaust manifold receiving pipe exhaust system and disconnect the pipe from the collector. O-ring discard.
  3. Remove the exhaust manifold.

Setting

PERFORMANCE ORDER

  1. Carefully smooth out interfaced surfaces, removing all traces of the old gasket material.
  2. If the pipe / collector to be replaced, be sure to replace the old with all fixture has been moved.
  3. Replace the cylinder head gasket new, using it to fix the guide bushings. Install the exhaust manifold and tighten the nuts by hand.
  4. Freely set the cylinder head intake manifold.
  5. Install the mounting bolts of the pipeline and tighten all fasteners shown in the accompanying illustration on the right with demanded effort. Please note that the efforts of the extreme tightening bolts are different from others.

Order of a tightening of fasteners (screws / nuts) intake manifold / exhaust manifold.

  1. Install the remaining components is made in the reverse order of removal. The joint assembly of a reception pipe exhaust system and the exhaust manifold is installed a new sealing ring.

Before connecting fuel lines to the fuel pipe, replace the O-ring compression fittings quick joints (Chapter power supply system and exhaust).

  1. Start the engine and check for fuel leaks, the exhaust gas and the loss of vacuum.




« previos page
Replacement valve springs, their plates and valve stem seals
next page »
Removal and installation of the cylinder head

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.