add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Mercedes-Benz M-Class (W163, 1997 issue)

general info. full specifications. diagnostics. hints. tips. tricks
Mercedes-Benz W163
Home
 
Mercedes-Benz
W163
Introduction
Controls and receptions of safe operation
Current care and maintenance
Engine
System of cooling, heating and air conditioner
Engine cooling system
Ventilation systems, heating and air conditioning
General information and safety measures
Removal and installation of the control panel operation of the heating / ventilation / air conditioning (for models 163,113 / 136/154/172/174 of 08/31/01)
Removal and installation of the cabin filter
Removal and installation of the fan heater / air conditioner and a resistive assembly
Removing and installing heat exchanger heater
Removal and installation of the stepper motor drive mode switching valve air circulation
Removal and installation of an electric motor drive the mixing flap
Removal and installation of the heat exchanger housing heater / air conditioner evaporator
A quick check of serviceability of functioning air conditioning system
Removal and installation of auxiliary fan assembly - models 163,136 / 154/157/172 corresponding complete
Removing and installing suction fan cabin air temperature sensor - model 163,113 / 136/154/157/172/174 of 08/31/01 to 01/09/99
Removing and installing ambient temperature sensor, - except for models of 163,128
Removal and installation of evaporator temperature sensor
Remove the cover of the evaporator K / V
Removal and installation of evaporator K / V
Removing and installing condenser K / V
Removal and installation of the expansion valve
Removal and installation of receiver-dryer
Removal and installation of the control module to the I / O (for models 163,113 / 136/154/172/174 of 08/31/01)
The power supply system and exhaust
Systems of an electric motor
Manual box of a gear change
The transmission automatically processed
Transmission Line
Brakes and auxiliary systems
Suspension and steering
Body
Onboard electric
 


Hit Counter by Digits


print page printable version

Removal and installation of the expansion valve



Details setting of the expansion valve

1 - Nuts expansion tank
2 - Expansion tank
3 - Self-locking nut
4 - Support bracket refrigerated lines
5 - Catches mount refrigerator lines

6 - Expansion Valve
7 - Bolts
8 - Sealing elements
9 - mounting bracket of the expansion valve to the evaporator K / V


PERFORMANCE ORDER

All sealing elements are subject to replacement without fail.

  1. Details setting of the expansion valve shown in the illustration, which includes all the links in the text.
  2. In the context of the workshop Car make discharge system K / V.
  3. Give fixing nuts (1) and move aside the coolant expansion tank (2).
  4. Disconnect from the expansion valve (6) support bracket refrigerated lines (4).
  5. Release refrigerated line of the intermediate clips (6) on the rear bulkhead of the engine compartment.
  6. Take the tube from the expansion valve (6) and remove the latter.
  7. Installation is in the reverse order - filling the air conditioning system should be carried out in a workshop of car-care center.





« previos page
Removing and installing condenser K / V
next page »
Removal and installation of receiver-dryer

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.