add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Volkswagen Transporter, Caravelle (1990 release)

general info. full specifications. diagnostics. hints. tips. tricks
Volkswagen Transporter / Caravelle
Home
 
Volkswagen
Transporter / Caravelle
Instructions
Engine
General Data Engine
Removing and installing engine
Removing radiator
Removal and installation of a mudguard of the engine
Toothed belt
Adjusting the timing belt
4-cylinder petrol engine
4-cylinder diesel engine
5-cylinder petrol engine
5-cylinder diesel engine
Removing and installing toothed belt
Cylinder Head
Removing and installing the camshaft
Hydraulic bucket tappets
Replacing valve stem seals
Valve
Compression Test
Belt
Troubleshooting Engine
Ignition system
Lubrication system
Engine cooling system
The power supply system of the engine
Fuel injection
Exhaust system
Coupling
Transmission
Suspension
A steering
Brakes
Wheels and tires
Body
Electrical
 


Hit Counter by Digits


print page printable version

5-cylinder diesel engine



Check

PERFORMANCE ORDER
1. Remove the top casing of a gear belt.
2. Loosen one turn the alternator mounting bolts and tension lug.
3. Unscrew the tensioning lug water pump and squeeze up generator.
4. Hit with a rubber hammer for between toothed belt camshaft drive gear and pinion water pump.
5. Turn the handle to ease spring control device VW 210.
6. Install the control panel between the camshaft drive pinion water pump so that the toothed belt slides passed between the measuring probe and the control unit.
7. Measure the control device toothed belt tension and remember.
8. Crank one turn and repeat the measurement.
9. Calculate the average of two measurements and compared with a desired value. Required value: The value of the scale 12 ... 13 on the meter VW 210.
10. If the average value is not correct, make adjustment of the timing belt.

Manual adjustment of the tension of the toothed belt until September 1991

PERFORMANCE ORDER
1. Tighten the spring control device to scale value 12 ... 13. On the side of the probe from the control unit performs a steel tongue, which caused a white horizontal stripe.
2. Install the control panel.
3. Loosen the screws water pump (screws shown in the figure on the left and right of a screwdriver). Rotate the mount via a large screwdriver or water pump, as shown, so that the control apparatus white horizontal strip coincided with the edge of the body.
4. Tighten the bolts to 20 Nm.
5. Turn the crankshaft one turn in the direction of rotation and repeat the measurement, if necessary, repeat the adjustment.
6. Screw the tension lug water pump and adjust the belt tension generator (see. Subsection 2.12.1).
7. Install the top casing of a gear belt.

A warning

If you do not have the control and regulation instrument (abroad, accident), the belt tension can be produced with improvised means.

Toothed belt pull so that when exposed to the thumb and forefinger fingers he was braided by 90 ?�.

Avoid high engine speed until the belt tension as possible in the near future will not be checked by the monitoring device.


Semi-automatic adjustment of a tension of a gear belt in October 1991

PERFORMANCE ORDER
1. Loosen 1 turn nut spring-loaded tension roller on the cylinder head. Automatically required toothed belt tension.
2. Turn the motor on 1/4 - 1/2 of a turn (90 ?� to 180 ?�) in the direction of rotation.
3. Tighten the nut to 15 N ?� m.




« previos page
5-cylinder petrol engine
next page »
Removing and installing toothed belt

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.