add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Volkswagen Transporter, Caravelle (1990 release)

general info. full specifications. diagnostics. hints. tips. tricks
Volkswagen Transporter / Caravelle
Home
 
Volkswagen
Transporter / Caravelle
Instructions
Engine
General Data Engine
Removing and installing engine
Removing radiator
Removal and installation of a mudguard of the engine
Toothed belt
Cylinder Head
Removing and installing the camshaft
Hydraulic bucket tappets
Replacing valve stem seals
Valve
Compression Test
Belt
Troubleshooting Engine
Ignition system
Ignition system
Safety precautions when handling electronic ignition system
Distributor
Check the high voltage transformer
Check the Hall sensor
Check and adjust the ignition timing
Spark plug
Troubleshooting ignition system
Lubrication system
Engine cooling system
The power supply system of the engine
Fuel injection
Exhaust system
Coupling
Transmission
Suspension
A steering
Brakes
Wheels and tires
Body
Electrical
 


Hit Counter by Digits


print page printable version

Check the high voltage transformer



High-voltage transformer is located in the engine compartment on the left under the fence in front of the battery, the transformer includes the ignition coil, the unit is turned off and the final output stage, which are in the same housing.

4- and 5-cylinder engine

PERFORMANCE ORDER
1. Disconnect the connector and wire high voltage transformer.
Check the resistance of the primary winding of the ignition coil
2. Connect an ohmmeter to terminals 1 and 15.
3. Required value: 0.5-0.7 ohms.
4. If the value obtained is not correct, replace the transformer.
Check the resistance of the secondary winding of the ignition coil
5. Connect an ohmmeter to terminals 15 and 4.
6. Required value: 3-4 ohms.
7. If the value obtained is not correct, replace the transformer.
8. Connect a voltmeter to terminals 1 and 3 (-) connector (4).
9. Turn the ignition switch. Required value: Battery voltage 12-14 V. If necessary, eliminate open circuit in the wiring according to the diagram.
10. Switch off the ignition, disconnect the voltmeter.
Verifying
11. Disconnect the valve of cold start and multicontact connection of injection valves.
12. Connect LED indicators to terminals 2 and 3 of the plug (4).

A warning

During this test, do not touch the hand of the connected parts of the transformer and high voltage wires of the indicator.


13. Turn on the starter.
14. The LED should flash.
15. Otherwise, check Hall sensor.
16. If the problem is not found, apparently faulty control unit Digifant.
17. Switch off the ignition.
18. Connect plug triple transformer.

Only 4-cylinder engine

PERFORMANCE ORDER
1. Connect a voltmeter to terminals 1 and 15 of the transformer.
2. Turn the ignition switch.
3. Required value: not less than 2, 1-2 seconds later to fall to 0 V. Otherwise, replace the transformer.
4. Connect the connector to the valve of cold start and multicontact connection of injection valves.




« previos page
Removal and installation of the distributor of ignition
next page »
Check the Hall sensor