Removing and installing the steering wheel and the spiral contact drum steering column
Removal / installation of the steering wheel Removal / installation of the steering wheel Removal / installation of the steering wheel Removal / installation of the steering wheel
| - Corresponding illustrative material is presented in the illustrations, which include all the links in the text.
- Disconnect the negative wire from the battery.
- Remove the module driver's front airbag (120) (see chap. Onboard electric equipment).
- Disconnect the electrical connectors horn (38b and 38c).
- Bring the front wheels in the straight-ahead position, then lock the steering column by removing the key from the ignition.
- Hold the steering wheel (32), unscrew the bolt (32c), - the bolt must be replaced without fail.
- Carefully remove the steering wheel (32), - try not to damage the wiring.
- Check the condition of the contact spiral drum (A45) electrical horn and the airbag in case of need make its replacement (See below.).
- Installation is in the reverse order - track correctness of combination of the landing labels.
|
|
Spiral pin reel Opening / Closing of the spiral contact drum Opening / Closing of the spiral contact drum Opening / Closing of the spiral track of the drum)
| - Corresponding illustrative material is presented in the illustrations, which include all the links in the text.
- Remove the steering wheel (see. Above).
- Loosen the screws (32h) just enough to allow removal of the contact drum (A45), - the bolts at the same time play the role of protection against rotation.
- Carefully remove the spiral drum assembly (A45) from the pipe jacket of the steering column.
- Disconnect the connector (38d) wiring drum assembly (A45).
- Assess the drum (A45), - the upper (32f) and lower (32g) section of the drum assembly is firmly attached to each other by means of clamps. Replace defective components, - try to avoid pinching the coil spring (32e) when connecting sections of the drum.
- Installation is in the reverse order. Ensure completeness landing drum (A45), - deepening should be combined with a locking latch (arrow), if necessary, make the alignment.
|
|
|