add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Mercedes-Benz M-Class (W163, 1997 issue)

general info. full specifications. diagnostics. hints. tips. tricks
Mercedes-Benz W163
Home
 
Mercedes-Benz
W163
Introduction
Controls and receptions of safe operation
Current care and maintenance
Engine
System of cooling, heating and air conditioner
The power supply system and exhaust
The power supply system of petrol engines
The power supply system of diesel engines
Overview
Checks fuel injection system
Service components of an inlet air path
Service components of the throttle
Emptying the fuel tank
Removal and installation of the gauge of a stock of fuel
Removal of air from a contour of low pressure fuel path - for example, the engine 612 series
Removal and installation of the fuel pump prior
Removal and installation of the fuel pump (high pressure pump)
Removal and installation of a fuel distributive highway and injectors
Removal and installation of the pressure sensor in the fuel line
Removal and installation of the electric shut-off valve - 163,113 models
Removal and installation of the valve, the fuel pressure regulator
Removal and installation of the valve assembly models 163,128
Removing and installing fuel cooler models 163,113
Removing and installing fuel injection control module
Removing and installing fuel tank
Exhaust systems and reduce emissions
Systems of an electric motor
Manual box of a gear change
The transmission automatically processed
Transmission Line
Brakes and auxiliary systems
Suspension and steering
Body
Onboard electric
 


Hit Counter by Digits


print page printable version

Removing and installing fuel cooler models 163,113



Details installing fuel cooler models 163.113 (612 series engine)


PERFORMANCE ORDER

  1. Details installing fuel cooler models 163.113 (engine series 612) are shown in the illustration, which includes all the links in the text.
  2. Open the hood and fix it in an upright position.
  3. Remove the trim panel of the cylinder head cover.
  4. Drain the coolant from the radiator.
  5. Disconnect the plug and plug the fuel hose (1) to the fuel cooler (5).
  6. Disconnect the coolant hose from the fuel outlet (2) - it immediately zakuporte.
  7. Disconnect the hose coolant (4) from the thermostat housing.
  8. Remove the mounting bolts (7) and remove fuel cooler assembly (5), disconnected from her water feed pipe (3).
  9. Installation is in the reverse order.
  10. Finally, start the engine and check for signs of leakage components of the power and cooling of the engine.





« previos page
Removal and installation of the valve assembly models 163,128
next page »
Removing and installing fuel injection control module

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.